| Project
Name: |
Galveston
Interstate 45 Causeway |
|
|
| Location: |
Galveston, TX |
| |
|
| Client: |
Texas
Department of Transportation |
| |
|
| Construction
Cost: |
$ 75,000,000 |
|
|
| Completion
Date: |
2007 |
|
|
| Summary: |
|
| |
|
| Alliance
provided full concrete inspection and testing services
for this $75 million project, which included the
replacement of the existing 6-lane, no-shoulder
causeway with 8-lanes and 2-shoulder lanes. This
project required assistance in meeting rigid schedules
to minimize interruption of operations through the
causeway. As a result, Alliance routinely
works days and nights. Alliance Technicians
perform most of their work on offshore barges where
complete batch plants and aggregate stockpiles have
been set up. |
| |
|
| |
|
|
Related Project Elements
|
 |
- Off-shore Concrete Batch Plant Inspection
- Off-shore Foundation Concrete Inspection
- Bridge Deck Concrete Inspection
|
| |
|